A copper mine in Jiangxi

A copper mine in Jiangxi

In -350m working level in the mine, the air humidity is more than 80% all the year round. And the machines have to drive five km to reach the working level in the mine. The four UL40 with best cost performance have been operating for 400 days without breakdown.

A mine in Hami of Xinjiang

A mine in Hami of Xinjiang

The LGMRT 3m3 electric shovel UL70E works 20 hours per day. The attendance rate is 100% since its delivery, proving its competency in-600 meters depth. it is about to work in the -1125 meters depth.

A mine in Xinjiang

A mine in Xinjiang

High altitude 5100m, drilling diameter 89mm - 102mm.

An open mine in Guangdong

An open mine in Guangdong

The ST120 has been working for more than 2,000 hours, with an average drilling speed at 62 m/h, an average daily drilling at 500 m/8 hours, and an average fuel consumption at 23.1 l/h. Its high efficiency, energy saving and environmental performance are recognized by the client.

A quartz mine in Shandong

A quartz mine in Shandong

The performance of ST120 in quartz mine, f=12-15 and delivery happened in July 2018. The comprehensive drilling efficiency is 32 m/h, and the fuel consumption is 0.757 l/m.

A highway construction in Inner Mongolia

A highway construction in Inner Mongolia

ST120 is recognized and praised by the client for its efficiency, energy saving and environmental performance in highway construction.